Preparations began for the replacement of second floor windows and their framing system. This is a mere hint of the improvements envisioned for the facade and sidewalk area along Boylston and Exeter Streets as part of the next phase of work on the Johnson building.All exterior improvements are subject to approval by the Boston Landmarks Commission with whom the library has been engaged for many months. Specific to the windows, the improvements include greater transparency as well as new glazing, new framing system — also referred to as mullions — and greater energy efficiency.
↧
Central Library Renovation: Exterior Work Begins
↧